Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9026953

- Product Categories
- Friendly Links
Information Name: | Supply China gas coal project feasibility study report |
Published: | 2012-10-30 |
Validity: | 30 |
Specifications: | |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | China gas coal project feasibility study report ------------------------------------ [report] 106288 [ publisher] Industrial Economics Research Institute [published] October 2012 the report format paper version: 15,000 yuan [electronic version]: 16,000 yuan [paper + electronic: 18,000 yuan [Delivery] Speedpost / E- MAIL [Order Phone] 010-56036118 010-52876950 [green channel] 15313900551 [Customer Service: QQ】 2697021579 【Contact】 Li Jun [corporate website] http://www.cyjjyjy.com/nengyuanbaogao/meitan/106288.html ( Click to view text) [directory] first part of gas coal project General, the the gas coal project background (a) Project name (b) Undertaker (c) project proposed areas and sites (d) to undertake a feasibility study work research work based on units (e) (f) job profile the gas coal project feasibility study conclusion (a) market forecast and the size of the project (b) site of raw materials, fuel and power supply (c) (d) project engineering technology program (e) Environmental Protection (vi) factory organization and labor quota (vii) the progress of construction projects (viii) Investment estimate and project financing (ix) financial and economic evaluation (j) project evaluation findings, gas coal project main technical and economic indicators part II of the the gas coal project background and development overview, gas coal project background two gas coal project development profile (a) has conducted research projects and their results (b) site, gas coal project necessity of investing in the third part of the scale of market analysis and construction, market research (a) of the proposed project outputs for use surveys (b) products in the domestic market investigation (c) the products abroad, market research (4) Price Survey, the domestic market forecasts, gas coal project product solutions and building scale (a) (b), the fourth part of the construction scale construction conditions and site selection, the gas coal project resources and raw materials (a) the supply of raw materials and auxiliary materials (two) supply of fuel and power, gas coal project construction choice (a) natural conditions, (b) infrastructure, (c) socio-economic conditions, the site selection of the fifth part of the plant technology solutions, gas coal project two production technology program production methods (a) standard (b) (c) technical parameters and process (d) the main process equipment selection (e) of the main raw materials, fuel, power consumption indicators (f) the main production plant layout program, general layout and transport (a) general layout principles (b) the warehousing program of the plant inside and outside the transport program (c) (d) covers an area and analyze four, gas coal project civil works (a) main building of gas coal characteristics and structural design of structures (b) The special foundation engineering design (c) gas coal material (d) The cost of civil works estimates the gas coal project engineering (a) (b) drainage engineering power and public works (c) the seismic fortification (d) life the sixth part of the welfare facilities energy conservation, the basis for preparing the seventh part of the preparation of the standard three, the energy consumption of the status quo, the main energy-saving programs and measures of environmental protection and labor safety, the basis for preparing the preparation of standard Third, the state of the environment, major sources of pollution and the five major pollutants, environmental protection measures to be adopted in the design six, seven labor protection and health and safety, fire eighth part of the the gas coal project organization structure and work and personnel, organizational structure, production class system and the labor quota of three annual total wage and the average wage of workers estimate sources of personnel and training of Part IX of gas coal project implementation schedule a production ready (d) of the equipment installation construction preparation of the the gas coal project progress stage (a) (b) (c) trial production gas coal project implementation schedule III, the the the gas coal project implementation costs (a) construction unit management fee (b) the production start-up costs (c) the production workers training fees (d) of office and living furniture purchase fee (e) survey design fees (f) should be the tenth part of the costs incurred Estimated investment and capital financing an Investment Estimate prepared in accordance with the investment estimated range of four, the total investment of the construction investment estimate (a) (b) of the construction investment (c) liquidity (d) other funds, the financing of Part XI of the financial evaluation, basic data and parameters selected two cost estimates of the cost sales revenue estimate four, financial analysis five, uncertainty analysis (a) a sensitivity analysis ( b) break-even analysis VI Schedule of Part 12 of the total evaluation of the technical and economic feasibility study of the gas coal project conclusions and recommendations of the thirteenth Part 1: construction investment estimate table in Schedule 2: operating income, sales taxes and additional calculations table in Schedule 3: The total cost estimate Schedule 4: fixed assets depreciation estimates table in Schedule 5: Schedule to the amortization of intangible assets and other assets Estimation Table 6: investment plans and financing table in Schedule 7: Liquidity estimate table Schedule 8: profit and profit distribution statement Schedule 9: Investment Cash Flow Statement Schedule 10: project capital cash flow statement Schedule 11: Financial plan Cash Flow Statement Schedule 12: the balance sheet of this report each quarter real-time updates, free service for one year, the specific content and the ordering process is welcome to consult the customer service staff, thank you for your attention! |
Admin>>>
You are the 11617 visitor
Copyright © GuangDong ICP No. 10089450, Business department of Industrial Economics All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11617 visitor
Copyright © GuangDong ICP No. 10089450, Business department of Industrial Economics All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility