Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9026953
| No.9026953
- Product Categories
- Friendly Links
| Information Name: | Supply Chinese weakly caking coal project feasibility study report |
| Published: | 2012-10-30 |
| Validity: | 30 |
| Specifications: | |
| Quantity: | 100.00 |
| Price Description: | |
| Detailed Product Description: | Weakly caking coal project feasibility study report ------------------------------------ [Report No.] 106 289 publishers Industrial Economics Research Institute Publication time October 2012 report format paper version: 15,000 yuan [electronic version]: 16,000 yuan [paper + electronic: 18,000 yuan [Delivery] EMS / E -MAIL [Order Tel] 010-56036118 010-52876950 [Green] 15313900551 [Customer Service: QQ】 2697021579 【Contact】 Li Jun [corporate website] http://www.cyjjyjy.com/nengyuanbaogao/meitan/106289.html (Click to view text) [directory] the first part of weakly caking coal project General weakly caking coal project background (a) Project name (b) Undertaker (c) the proposed project area and place (d) undertake feasibility research work based on research work units (e) (f) job profile, market forecasts and the size of the project (b) of weakly caking coal project feasibility study conclusion (a) raw materials, fuel and power supply (c) site (d) comprehensive evaluation of the project engineering and technical programs (e) Environmental Protection (vi) factory organization and labor quota (g) (h) investment project construction schedule estimates and financing (ix) Project Finance and Economic Evaluation (j) Conclusion weakly caking Coal projects main technical and economic indicators Table Project Background and Development of the second part of weakly caking coal, weakly caking coal project background, weakly caking coal project development profile (a) the research project and its outcomes (b) site three weakly caking coal project investment, the need for the third part of the market analysis and the scale of construction, market research (a) the proposed project outputs for use surveys (b) (c) products in the domestic market investigation foreign market research (d) A survey on the prices domestic market forecasts, weakly caking coal project program and construction scale (a) (b), the scale of construction, the fourth part of the building and site selection, weakly caking coal project resources and raw materials ( a) the supply of raw materials and auxiliary materials (b) fuel and power supply two infrastructure weakly caking coal project construction choice (a) natural conditions (b) (c) socio-economic conditions, site selection of the fifth part of the plant technology a weakly caking coal project components, the technical parameters of the production methods of production technology (a) standard (b) (c) and process (d) the main process equipment selection (e) of raw materials, fuel and power consumption indicators ( f) the main production plant layout program, the general layout and transportation (a) general layout principles (b) the warehousing program of the plant inside and outside the transport program (c) (d) covers an area and analyze four weakly caking coal project civil works (a) of the main building, the design of special foundation engineering structures weakly caking coal characteristics and structural design (b) (c) weakly caking coal material (d) cost of civil works estimates five weakly caking coal projects other projects (a) water supply and drainage Engineering (b) power and public works (c) the seismic fortification (d) Part VI of the life and welfare facilities energy conservation, the seventh part of the basis for preparing, preparation of standards, energy consumption of the status quo four major energy-saving programs and measures of environmental protection a basis for preparing, preparation of standard Third, the state of the environment four major sources of pollution and major pollutants Five labor safety in the design of the proposed environmental protection measures six, seven labor protection and health and safety, fire Part VIII weakly caking coal project organization structure and work and personnel, organizational structure, production class system and labor quota, the total annual wage and the average wage of workers estimate four sources of personnel and training Part IX weakly caking coal project implementation schedule, weakly caking coal project progress the production preparation equipment installation construction preparation stage (a) (b) (c) (d) trial production Second, weakly caking coal project implementation schedule, the construction unit management fee (b) production of weakly caking coal project implementation costs (a) preparatory fee (c) of production workers training fees (d) office and living furniture purchase costs (e) survey and design fees (f) should be the tenth part of the costs incurred Estimated investment and capital mobilization, investment estimation Basis, investment other funds of the estimated range, the total investment of the capital investment estimate (a) (b) construction investment (c) Liquidity (d) Fourth, the financing of Part XI of the financial evaluation, basic data and parameters selected two cost estimates sales revenue estimates, financial analysis five, uncertainty analysis, sensitivity analysis of (a) (b) break-even analysis VI, Part 12 of the total evaluation of the technical and economic weakly caking coal project feasibility study conclusions and recommendations XIII part Schedules Schedule 1: construction investment estimate table Schedule 2: operating income, business tax and surcharges statement Schedule 3: Schedule of the total cost estimate table 4: fixed assets depreciation estimates table in Schedule 5: intangible assets and other the asset amortization estimate Schedule 6: investment plans and financing table Schedule 7: Liquidity estimate table Schedule 8: profit and profit distribution statement Schedule 9: Investment Cash Flow Statement Schedule 10: project capital cash flow Schedule Table 11: Financial plan Cash Flow Statement Schedule 12: balance sheet each quarter of this report can be updated in real time, free service for one year, the specific content and ordering process welcomed the consultation with the customer service staff, thank you for your attention! |
Admin>>>
You are the 11617 visitor
Copyright © GuangDong ICP No. 10089450, Business department of Industrial Economics All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 11617 visitor
Copyright © GuangDong ICP No. 10089450, Business department of Industrial Economics All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

